Case example of E1 series retrofit installation (Store Facility)
Tennoji MIO Renewal

Project overview

Location:Tennoji ward, Osaka-shi
User:Tennoji Terminal building Co.,Ltd.
Building type:Leasing facility (Product sales, restaurant and more)
Number of floor:12 floors
Completion:Aug. 1995
Retrofit on Feb. 2010
GHP location:On the rooftop of building
Gas distributor:OSAKA GAS Co., Ltd. (LNG)

Outer appearance
Tennoji ward, Osaka-shi Tennoji MIO

Product installed

Indoor unit

Indoor unit

Remote controller

Remote controller

Outdoor unit (On the rooftop of building)

Backward: 7.5HP unit installed in 2005

Outdoor unit

Outdoor unit (On the rooftop of building)

The unit installed in the same space of previous 2units

Outdoor unit

Precondition

Gas Engine Driven Heat Pump
6.5HP×1unit
3HP×1unit
Total 9.5HP

Aisin recommendation

E1 series retrofit type
Outdoor unit
Stand-alone type
 13HPAXYGP355E1ND×1unit
 Total13HP (capacity upgrade)
Indoor unit
Ceiling mounted duct type
 AXMP140AP140×1unit
 AXMP90AP90×2units
Total 3units

Effect after the retrofit with E1 series (example)

Delivery with elevator thanks to small size & right weight of unit

Possible to carry in elevator

Capacity upgrade

Nearly 1.35 times more