Case Examples Visit the Aisin Case Examples page for detailed examples of installations and customer feedback.

Case example of E1 series retrofit installation (Hospital/Welfare Facility)
Yanagawa Yasuraginosato Retrofit

Project overview

Location:Yanagawa-shi, Fukuoka-pref.
User:Medical corporation Yanagawa Jikeikai
Building type:Nursery
Construction type:Reinforced concrete
Number of floor:4 floors
Total floor area:4,462 m2
Completion:1995
Retrofit in May 2008 & Oct. 2010
Maintenance:TAIHEI Engineering Co.,Ltd

Outer appearance
Yanagawa-shi, Fukuoka pref Yanagawa Yasuraginosato

Product installed

Indoor unit
(Function training room)

Indoor unit

Indoor unit
(Home care training room)

Indoor unit

Outdoor unit
(Left: 4units replaced in 2008, Right: 2units replaced in 2010)

Outdoor unit

Precondition

Gas Engine Driven Heat Pump

Aisin recommendation

E1 series retrofit type
Outdoor unit
Stand-alone type
 20HPAXYGP560E1P×2units
 10HPAXYGP280E1P×1unit
 8HPAXYGP224E1P×1unit
Total 58HP
Indoor unit
Ceiling mounted cassette Double Flow type
 AXCP56MP56×5units
 AXCP71MP71×1unit
Ceiling mounted cassette Round Flow type
 AXFP71MCP71×8units
 AXFP80MCP80×4units
 AXFP90MCP90×1unit
 AXFP45MCP45×1unit
Ceiling built-in type
 AXSP112MP112×2units
Total 22units

Effect after the retrofit with E1 series (example)

Energy saving improved

Comparison of gas consumption
The gas consumption of the model before is regarded as 100.

User's voice (This is an individual impression. It varies according to installation situation.)

Reason of selection

  • We have been using GHP since we start the business in 1995. After long-term use, we considered to replace GHP.
    We initially considered to adopt EHP during the 1st retrofitting phase of project, but due to cost increase from higher demand and EHP installation,
    we selected GHP as the infrastructure was already there.
  • As for the manufacturer of GHP, we selected Aisin since the maintenance support is reliable.
    For the second retrofitting phase, we selected Aisin GHP again for the same reason.

Impression

  • It was difficult to satisfy both requirements of day-care room and kitchen as they shared the same air conditioning system.
    However, the maintenance company; Taihei engineering separated the system during the second retrofitting phase.
    Although an additional outdoor unit was required, now we can provide desirable air conditioning for each space.
    We are happy to reduce the gas consumption by 17% after installing E1 series
    .